• español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   DSpace Home
  • Producción Científica
  • Departamento de Ingeniería Eléctrica y Automática
  • DIE-Artículos, capítulos, libros...
  • View Item
  •   DSpace Home
  • Producción Científica
  • Departamento de Ingeniería Eléctrica y Automática
  • DIE-Artículos, capítulos, libros...
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Maximising hydropower generation in gravity water distribution networks: determining of the optimal location and number of pump as turbines

Thumbnail
View/Open
maximizing_hydropower_generation (1.153Mb)
Author
Fernández García, Irene
Mc Nabola, Aonghus
Publisher
American Society of Civil Engineers
Date
2020
Subject
Water distribution networks
Energy recovery
Micro-hydropower
Pump As Turbine
METS:
Mostrar el registro METS
PREMIS:
Mostrar el registro PREMIS
Metadata
Show full item record
Abstract
Water distribution networks have to face the challenge of providing for a growing population with efficient management of water and energy. Pressure control in water networks is an efficient strategy to reduce leakage, which is usually carried out by installing pressure-reducing valves. Because the operation of these elements involves energy dissipation, the replacement of pressure-reducing valves by hydropower turbines has been widely analyzed. Thus, in this work a methodology focused on the detection of the optimal location and number of pumps as turbines (PATs) to maximize hydropower generation in gravity water distribution networks is proposed. The methodology considers a mathematical optimization and evaluates the real PAT performance at each node. Installation costs and payback period have been considered to determine the viability of installations. The application of this methodology to six water distribution networks showed potential hydropower locations in three, with values of daily recovered energy from 43 to 231 kWh. Although the optimization methodology developed here is not suitable for complex looped networks due to the computational time required, for branched networks it is a powerful tool offering decision makers information about hourly power, total installation costs, and payback period at each potential node in a network.
URI
http://hdl.handle.net/10396/31901
Fuente
Fernández García, I. and Mc Nabola, A. 2020. Maximising hydropower generation in gravity water distribution networks: determining of the optimal location and number of pump as turbines. Journal of Water Resources Planning and Management. American Society of Civil Engineers. 146-1, pp.04019066
Versión del Editor
https://doi.org/10.1061/(ASCE)WR.1943-5452.0001152
Collections
  • Artículos, capítulos, libros...UCO
  • DIE-Artículos, capítulos, libros...

DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
© Biblioteca Universidad de Córdoba
Biblioteca  UCODigital
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage Statistics

De Interés

Archivo Delegado/AutoarchivoAyudaPolíticas de Helvia

Compartir


DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
© Biblioteca Universidad de Córdoba
Biblioteca  UCODigital